Policy paper

HS2 Phase Two strategic case

Strategic case for the HS2 Phase Two route from the West Midlands to Leeds and Manchester, including the accelerated delivery of HS2 Phase 2a.

This was published under the 2016 to 2019 May Conservative government

Documents

High Speed Two Phase Two strategic case

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

High Speed Two Phase Two strategic case appendix: HS2 released capacity study summary report

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This is the strategic case for the HS2 Phase 2a route from the West Midlands to Crewe and the HS2 Phase 2b route from Crewe to Manchester and from West Midlands to Leeds.

The strategic case sets out the case for HS2 and how it fits with the government’s strategic aims and objectives, including:

  • demonstrating the case for HS2, including latest analysis of the capacity released on the network with the introduction of HS2
  • setting out the economic appraisal of the expected costs, benefits and revenues for HS2 Phase Two
  • considering strategic alternatives to HS2 Phase 2a

The HS2 Phase Two strategic case builds on the:

The HS2 Phase Two strategic case forms part of the 5 part outline business case (OBC) for HS2 Phase 2a and strategic outline business case (SOBC) for HS2 Phase 2b. The other parts are:

Updates to this page

Published 17 July 2017

Sign up for emails or print this page