Impact assessment

MA05 Transport Assessment Part 2 (TR-002-00005)

A report presenting the existing and forecast future baseline transport network conditions in MA05 and the expected traffic and transport effects of High Speed Two, Phase 2b Crewe – Manchester may have on these baseline conditions.

Documents

MA05 Transport Assessment Part 2 (TR-002-00005)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email [email protected]. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

A report presenting the existing and forecast future baseline transport network conditions in MA05 and the expected traffic and transport effects of High Speed Two, Phase 2b Crewe – Manchester may have on these baseline conditions.

Updates to this page

Published 24 January 2022

Sign up for emails or print this page