SR2015 No 33: repairing and protecting up to 20 metres of main river bank
Standard rules for repairing and protecting up to 20 metres of main river bank using natural materials.
Applies to England
Documents
Details
These rules allow you to repair and protect up to 20 metres of main river bank using natural materials, such as:
- willow for willow spilling
- hurdles made from hazel
These rules do not allow these activities on or within:
- 8 metres of flood defences
- 50 metres of another section of river bank that has already been reinforced in the last 2 years
You must not carry out these activities during the fish breeding season.
Updates to this page
Published 6 April 2016Last updated 31 July 2019 + show all updates
-
Updated operational conditions and screening distances associated with each standard rule. The aim of this is to improve the uptake of flood risk standard rules permits.
-
First published.